To support the top of the hole in dry loose sand or very wet soils, to prevent hole collapse and fall-in which contaminates the sample. It consists of a 1.0-meter long aluminium tube (can be cut to suit) fitted with handles and an aluminium bush which slides over the shank on the auger.
Options: Spare bushes
Item Code BP